In October 2004, the first arch of the viaduct on the access ramp was cleaned, the path was extended and new fencing was installed.Two live information screens have been added showing the trains service, type and stops / calls.[5] A car park, at the top of platform 2 access road, which engineers use to get machinery onto the tracks in the area, will be completed as of Winter 2020 with near 200 spaces including e-car charging facilities as well as car club spaces and secure cycle lockers.There are now two trains per hour each way, both running to Leeds eastbound (one via Bradford, the other via Brighouse) and Manchester Victoria westbound; the latter then continue to either Chester or Wigan Wallgate.[6] On Sundays, the Leeds to Chester via Manchester Victoria and York to Blackpool North trains both call hourly.