Changzhou Metro
The first phase runs from Forest Park (森林公园) in the north to Nanxiashu (南夏墅) in the south.[5] In its first year of operation, the highest passenger flow in a single day was 243,000 on October 2 and total ridership in 2019 was 10.3 million.The full-scale construction of Line 5 is scheduled to begin in 2024, with an anticipated completion date set for 2028.Each car features 4 pairs of 1.3 meters (4 ft 3 in) wide doors on both sides, accommodating up to 2062 passengers.The trains are constructed using lightweight aluminum alloy material, designed for a service life of 30 years.