Changchun–Baicheng railway

The railway is 325.7 kilometres (202.4 mi) and has a design speed of 160 kilometres per hour (99 mph).[2] Starting in 2014, the railway underwent an upgrade which saw bridges and tunnels built to replace level crossings.The radius of corners was also increased and the line was double-tracked.In 2019, the Fuxing CR200J EMU was introduced on the line.This People's Republic of China rail-related article is a stub.
ChangchunHeavy railTrack gaugeElectrificationHarbin–Dalian HSRBeijing–Harbin railwayBeijingChangchun–Jilin ICRHarbinSipingQiqiharChineseFuxing