Chengdu–Pujiang intercity railway
It will connect the provincial capital of Chengdu with south-western cities along the western edge of the Sichuan Basin to Pujiang.It will be built as a National Railways Class I, double tracked electrified line with a design speed of 200 km/h (120 mph) and a total length of 99 km (62 mi).Construction and management of this line has been conducted by a joint venture limited liability company between Chengdu Metro and China Railway Chengdu Group.[1] Chengdu–Pujiang intercity railway begins in Chengdu at Chengdu West railway station, branching off the Chengdu Ring Railway to travel westwards via Wenjiang, Chongzhou, Dayi County, Qionglai and Pujiang County.Preliminary land acquisition and demolition work was carried out by the end of 2012, allowing for construction to begin.