Jebba Hydroelectric Power Station
[1] The Jebba Power Station is located about 100 kilometres (62 mi) downstream of the Kainji Dam,[1] and approximately 40 kilometres (25 mi) southwest of Mokwa, the nearest urban centre.[2] This is approximately 256 kilometres (159 mi) by road, southwest of Minna, the capital of Niger State.[4] Jebba Dam sits at an elevation of 71.917 metres (236 ft) above mean sea level.Mainstream Energy also holds the concession on the 760 megawatts Kainji Hydroelectric Power Station, located about 100 kilometres (62 mi).[6] In January 2021, Andritz AG, an Austrian engineering conglomerate, was selected by Mainstream Energy to repair the defective turbine and restore to power station to maximum capacity.