Twenty-eight by '28

The Twenty-eight by '28 initiative is an effort set forth by former Mayor Eric Garcetti that the City of Los Angeles complete 28 transportation infrastructure projects before the start of the 2028 Summer Olympics on July 14, 2028 (2028-07-14) and the 2028 Summer Paralympics the following month.Most of the projects on the original list are funded through Measure R and Measure M and will receive accelerated priority, though several more were proposed by this plan.[1] In December 2018, the Los Angeles County Metropolitan Transportation Authority stated it would need $26.2 billion to complete the list of projects.[2] In March 2024, the Metro Board substituted 11 projects that could not be implemented in time for the 2028 Olympic and Paralympic Games with 11 projects that would be able to hit this deadline and are in line with the agency's 2028 Mobility Concept Plan.[3] The following 11 projects were included in the original 2018 project list but were substituted in March 2024 with 11 operational/in-progress projects that would better meet the 2028 Olympic and Paralympic Games deadline.
Eric GarcettiCity of Los Angeles2028 Summer Olympics2028 Summer ParalympicsMeasure RMeasure MLos Angeles County Metropolitan Transportation AuthorityA LineSilver Line (J Line)Crenshaw/LAX Line Transit ProjectRegional ConnectorAirport Metro Connector stationJ LineRosecransInterstate 5North Hollywood to Pasadena Bus Rapid TransitLos Angeles River bicycle pathG LineWashingtonOlympicVeniceInterstate 105ExpressLanesState Route 57Vermont Transit Corridor Bus Rapid TransitInterstate 405MicrotransitLos Angeles RiverSystem Bike PathSepulveda PassMetro ExpressLanesEast San Fernando Valley Light Rail Transit ProjectInterstate 710C Line (Green) Extension to Torrance Transit ProjectInterstate 10Interstate 605San Bernardino LineSepulveda Transit Corridor ProjectEastside Transit Corridor Phase 2Southeast Gateway LineChatsworthNorth HollywoodBalboaWillow StationFlorence AvenueImperial HighwayLong BeachNorwalk C Line stationNexstar Media GroupInstagramLos Angeles County Metropolitan Transportation Authority (Metro)Metro RailLight railC LineE LineK LineRapid transitB LineD LineMetro BuswayMetro BusMetro RapidMetro Bike ShareUnion StationPatsaouras Transit PlazaMetro Headquarters BuildingEl Monte StationHarbor Gateway Transit CenterList of Metro Rail stationsList of Metro Busway stationsEl Monte BuswayHarbor TransitwayLAX/Metro Transit Center stationD Line ExtensionFoothill ExtensionRail to RailArts District/6th Street stationK Line Northern ExtensionEastside Transit CorridorC Line ExtensionLincoln Boulevard Transit CorridorNorth Hollywood to Pasadena Transit CorridorSepulveda Transit CorridorVermont Transit CorridorBus fleetRolling stockHistory of the LACMTAHistory of Los Angeles Metro Rail and BuswayL LineTransit Access Pass (TAP)Transportation in Los AngelesLAX FlyAwayLAX Automated People MoverMetrolink commuter railExpo Bike PathG Line Bikeway