Sơn La Dam
Several studies were carried out, including by the Moscow Institute of Hydroelectric and Industry, Electricity and Power Distribution Company (Japan), Designing Research and Production Shareholding Company (Moscow) and SWECO (Sweden).In May 2000, the National Assembly of Vietnam postponed the decision due to lack of information on relocation and compensation plans and for feasibility studies for a scaled-down version of the dam.The power plant consists of six turbines with generating capacity of 400 MW each.[1][3][5] It has a total capacity of 2,400 MW with an expected annual generation of 10,246 GWh.[6] The project required displacement of more than 91,000 ethnic minority people, the largest resettlement in Vietnam's history.