Acholibur–Gulu–Olwiyo Road
[3] The road connects the districts of Kitgum, Pader, Gulu, and Nwoya.[5] On 21 February 2015, the upgrade from unsealed gravel surface to class II bitumen surface was commissioned by President Yoweri Museveni.The work on the 73 kilometres (45 mi) from Acholibur to Unyama is assigned to China Railway No.5 Engineering Group.The 70 kilometres (43 mi) road section from Unyama to Olwiyo was upgraded by Jiangxi Zhongmei Engineering Construction Company Limited.[6] The road project is fully funded by the Ugandan government.