Zhengzhou BRT
The system officially started operation on May 28, 2009 with a 30 km loop line (B1) with 38 stations.It is believed that the daily ridership was approximately 1 million passengers after the opening of the first segment of the 23.7 km long[2] 3rd Ring Road loop line (B3) on June 26, 2014.[3] A new east-west BRT corridor under the Longhai Elevated Road opened on January 26, 2017.[4][5] With the imminent opening of Zhengzhou Metro Line 5 The B1 Loop corridor is being shifted from to avoid duplication.The Zhengzhou government is proposing to introduce trolleybus lines to the B2 Nongye Road BRT corridor, reintroducing trolleybus operation to Zhengzhou which stopped operation in 2010.