Siem Reap–Angkor International Airport

[2][1] SAI covers an area of 700 hectares (1,730 acres) of land and has a 3,600 m runway.[5] The airport was built to replace Siem Reap International Airport, which proved unable to handle increased traffic and caused damage to Angkor Wat due to pollution.[6][3][7] The project was introduced in 2010,[8] and a Chinese company, Yunnan Investment Holdings Limited, was selected to build the airport in December 2016.[9] Construction started in July 2018, and was delayed due to the COVID-19 pandemic and a labor shortage.[9] The third phase, planned for completion by 2050, will increase the total capacity to over 20 million passengers per year.
Jet bridge at passenger terminal
Passenger terminal
Siem Reap International AirportKhmer scriptSiem ReapSotr NikumCambodiaAir CambodiaFocus cityVietnam AirlinesAirAsia CambodiaSky Angkor AirlinesCoordinatesRunwaysConcreteinternational airportSoutr Nikom DistrictSiem Reap provinceAngkor Wathectaresbuild–operate–transferCOVID-19 pandemicjet bridgesair traffic controlrunwaytaxiwaynarrow-body aircraftBoeing 737Airbus A320wide-body aircraftBoeing 747Boeing 777Boeing 787Airbus A330Airbus A350AirAsiaKuala Lumpur–InternationalPhnom PenhSihanoukvilleSingaporeDa NangHo Chi Minh CityAsiana AirlinesSeoul–IncheonBangkok AirwaysBangkok–SuvarnabhumiCambodia AirwaysChina Eastern AirlinesKunmingShanghai–PudongIndiGoKolkataLao AirlinesLuang PrabangSingapore AirlinesThai AirAsiaBangkok–Don MueangPhuketThai Airways InternationalVietJet AirList of airports in CambodiaABC NewsNBC NewsXinhua NewsCambodia Angkor AirAirportsInternationalSihanoukDomesticBanlung–RatanakiriBattambangKampong ChamKampong ChhnangKampotKoh KongKrakorKratiéSenmonorom–MondulkiriTbeng MeancheyTecho–Ta KhmauDara SakorStung Treng