Line 1 (Ürümqi Metro)

The northern section from International Airport to Balou, was opened on 25 October 2018.The southern section from Balou to Santunbei opened on 28 June 2019.[2] The 27.615 kilometer[1] long, 21 station line commenced construction in March 2014.The northern section of Line 1 (16.5 km[2]) opened on 25 October 2018.The southern section of Line 1 (11.1 km[2]) opened on 28 June 2019.
ÜrümqiXinjiangInternational AirportRapid transitÜrümqi MetroTrack gaugeSimplified ChineseTraditional ChineseStandard MandarinHanyu PinyinUyghurLatin YëziqiYengi YeziⱪSiril YëziqiTianshanShuimogouSaybagXinshiKashi Laining (KHG)Ürümqi Diwopu (URC)Alashankou (AKR)Altay (AUR)Hami (HMR)Hongguang (HGR)Hotan (VTR)Kashgar (KSR)Kuche (KCR)Moyu (MUR)Pishan (PSR)Turpan (TFR)Turpan North (TAR)Ürümqi (WAR)Ürumqi South (WMR)Jinghe–Yining–Khorgos railwayLanzhou–Xinjiang railwayEurasian Land Bridge